
- Location: Redondo Beach
- Completed: Oct 2026
- Client: A restaurant kitchen
Semi-Annual Testing of a CaptiveAire Two-Tank Kitchen System in Redondo Beach, CA
Semi-annual test of a CaptiveAire two-tank system over a range, griddle, salamander and fryers: balloon air test on every nozzle, gas and power shut-off, and the alarms.







