Two-Visit Restoration of a Grease-Clogged Three-Tank Ansul R-102 System in Bell, CA

A three-tank Ansul R-102 system unserviced for five years, its nozzles clogged with grease: cleaned, re-linked, capped, hydrotested, air-tested and tagged over two visits.

Client: A high-volume quick-service restaurant · Quick-service restaurant

Gloved hand holding a nozzle part clogged with hardened grease in front of a fryer

Project Facts

Location
Bell
Completed
November 2026
Facility type
Quick-service restaurant
Systems
Ansul R-102 wet chemical system, three 3-gallon cylinders · Gas shut-off valve and microswitch interlock · One Class K extinguisher · Two 5-lb ABC extinguishers
Codes
NFPA 17A · NFPA 96 · NFPA 10 · Local fire code
Authority having jurisdiction
Los Angeles County Fire Department

The challenge

What the Client Needed

A busy quick-service kitchen's Ansul R-102 system, with three 3-gallon cylinders, had not been serviced in over five years. Hardened grease clogged the discharge nozzles and scissor link holders, four nozzle caps were missing or hanging loose, the fusible links were past their service life, and the cylinders and the kitchen's extinguishers were due for their periodic tests.

What we did

How the Job Was Done

  1. Visit 1: cleaning

    All nine grease-clogged discharge nozzles and the scissor link holders were degreased and cleaned so agent can flow freely.

  2. Visit 1: new links and caps

    Nine 450°F fusible links were replaced and four new Ansul metal blow-off caps were fitted with their retaining wires intact.

  3. Visit 1: interlock test

    The release mechanism was tested: the gas shut-off valve closed and the microswitch electrical interlock worked.

  4. Visit 1: extinguishers

    The Class K extinguisher had its 5-year hydrostatic test, and the two 5-lb ABC extinguishers had their 6-year internal maintenance under NFPA 10.

  5. Visit 2: cylinders

    All three 3-gallon cylinders had their 12-year hydrostatic test, an internal inspection and a fresh agent charge.

  6. Visit 2: piping air test

    The discharge piping was air-tested under pressure to confirm every line was clear and leak-free to each appliance and duct nozzle after the grease buildup. The system was then reassembled, armed and tagged.

Results

The Outcome

  • Every nozzle clear

    Grease removed and the piping air-tested to each nozzle.

  • Cylinders and extinguishers tested

    Three cylinders hydrotested; Class K hydrotested; two ABC units maintained.

  • Protected against new grease

    Four new metal blow-off caps, retaining wires intact.

Photos

On the Job

Select a photo to view it full size with its caption.

  • Ansul pull station and Class K extinguisher with new service tags
    Pull station and Class K extinguisher, tagged
  • Gloved hand holding a nozzle part clogged with hardened grease in front of a fryer
    Grease found inside the system
  • ABC extinguisher with a new service tag inside a break-glass cabinet
    ABC extinguisher in its cabinet
  • Class K fire extinguisher with a new service tag on a kitchen wall
    Class K extinguisher, re-tagged
  • Ansul cylinder, release mechanism and cartridge inside the system enclosure
    Ansul cylinder and release mechanism

Photo 1 of 5

Ansul pull station and Class K extinguisher with new service tags
Swipe for more

More of our work

See all our work →

Request a Quote

Stay Compliant. Stay Safe.

Tell us what you need and we'll get back to you within 2 hours.

  • Response within 2 hours
  • Upfront pricing, no hidden fees
  • Licensed: CSLB #976500 · Title 19

Free on-site evaluation for most jobs. We'll tell you before any charge.

By submitting, you agree to our Privacy Policy. We don't sell your information. Details you send us are used to contact you about your enquiry.