• Kitchen Fire Suppression
  • Location: Downtown Los Angeles
  • Completed November 2026

Recertifying a Pollution Control Unit's Ansul System, Unserviced Since 2007, in Downtown Los Angeles

While servicing a high-rise restaurant's hoods we found its pollution control unit's Ansul system last serviced in 2007. We fitted a hydrotested cylinder and new parts after hours.

Client: A restaurant in a downtown high-rise office complex · Restaurant in a high-rise office complex

Ansul R-102 cylinder, release mechanism and cartridge inside the pollution control unit's suppression cabinet

Project Facts

Location
Downtown Los Angeles
Completed
November 2026
Facility type
Restaurant in a high-rise office complex
Systems
Ansul R-102 3-gallon wet chemical system in a pollution control unit (PCU) · Building fire alarm connection
Codes
NFPA 17A · NFPA 96 · Local fire code
Authority having jurisdiction
Los Angeles Fire Department

The challenge

What the Client Needed

High-rise kitchens often send exhaust through a pollution control unit (PCU), a filtration box in the duct with its own suppression system. During the restaurant's hood service our technicians checked the PCU too: tags and cylinder stamps showed its Ansul R-102 3-gallon system had not been serviced, tested or certified since 2007, with the 12-year hydrostatic test and the original actuation cartridge long out of date.

What we did

How the Job Was Done

  1. After-hours access

    A two-technician crew came in after closing and worked with building engineering for access to the PCU enclosure in the ceiling, the suppression cabinet and the fire alarm interface.

  2. Cylinder replacement

    The 2007 cylinder was replaced with one that had already passed its hydrostatic test.

  3. New cartridge and fusible link

    The 2007 actuation cartridge was replaced with a new one and a new fusible link was installed in the PCU detection line.

  4. Function test and tags

    The PCU system was function-tested, its signal to the building fire alarm panel confirmed, and it was reset and tagged.

Results

The Outcome

  • A 19-year gap closed

    The PCU system has a hydrotested cylinder and is tested and tagged again.

  • Hoods and PCU both covered

    The exhaust is protected from the cooking line through the filtration unit.

  • No lost service

    All work after hours.

Photos

On the Job

Select a photo to view it full size with its caption.

  • Ansul R-102 cylinder, release mechanism and cartridge inside the pollution control unit's suppression cabinet
    The PCU's Ansul cylinder and release mechanism
  • Access panel on a pollution control unit in a high-rise mechanical space
    Pollution control unit access panel
  • Ansul suppression cabinet mounted on a wall with discharge piping above it
    Suppression cabinet and piping
  • Pollution control unit fan access panel beside a variable speed drive
    Fan access panel and drive

Photo 1 of 4

Ansul R-102 cylinder, release mechanism and cartridge inside the pollution control unit's suppression cabinet
Swipe for more

More of our work

See all our work →

Request a Quote

Stay Compliant. Stay Safe.

Tell us what you need and we'll get back to you within 2 hours.

  • Response within 2 hours
  • Upfront pricing, no hidden fees
  • Licensed: CSLB #976500 · Title 19

Free on-site evaluation for most jobs. We'll tell you before any charge.

By submitting, you agree to our Privacy Policy. We don't sell your information. Details you send us are used to contact you about your enquiry.